Maintenance: quarterly

ops #maintenance #managers #checklist

Quarterly maintenance — every 3 months. Schedule as a half-day project.

Major service calls

  • [ ] HVAC: vendor service call (filter change + coil inspection)
  • [ ] Walk-in: vendor service call (compressor + coils + drain line)
  • [ ] Hood + ventilation: vendor cleaning (kitchen)
  • [ ] Plumbing: walk-through with vendor for any slow drains, leaks
  • [ ] Fire suppression system (kitchen): vendor inspection — REQUIRED by NYC code semi-annually, doing it quarterly is safer
  • [ ] Pest control: deep treatment service

Equipment deep service

  • [ ] Yakitori grill: full disassembly clean
  • [ ] Espresso machine: vendor service (group head rebuild if needed)
  • [ ] Coffee grinder: blade replacement check
  • [ ] Glasswasher: vendor preventive maintenance
  • [ ] Dishwasher: same
  • [ ] Ice machine: vendor cleaning + filter change (equipment-ice-program-tools)

Refresh

Sign-off

GM signature: Date: