Bartender: Opening the well

Opening the well happens 30 minutes before doors. Same sequence every shift.

  1. Pull pebble ice from the Hoshizaki. Fill the divided 2x2 wells.
  2. Pull big-cube ice. Fill the cube section.
  3. Pull syrup backups from the walk-in. Stock in the well rail.
  4. Wipe down the entire bar top with sanitizer. Let dry.
  5. Set up dump-and-rinse station: strainer in, fresh water.
  6. Stock jiggers, strainers, mixing tin, Hawthorne in apron slots.
  7. Confirm garnish tray is prepped (citrus, mint, olives, picks).
  8. Confirm fresh water for every bar seat in advance.

If anything is missing, tell the MOD before doors open, not during service.